# Ad hoc projects in Tool Store

**URL:** <https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701>\
**Category:** In discussion\
**Tags:** onix-work, onix-tool-store\
**Created:** [October 30, 2026, 10:54am UTC](https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701 "2026-10-30T10:54:22Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![julie.nymo](https://avatars.discourse-cdn.com/v4/letter/j/d78d45/32.png) [@julie.nymo](https://community.onix.com/u/julie.nymo)\
**Post date:** [October 30, 2026, 10:54am UTC](https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701/1 "2026-10-30T10:54:22Z")

</div>

Continuing the discussion from [Tool Store - Check-out history as invoicing basis](https://community.onix.com/t/tool-store-check-out-history-as-invoicing-basis/2699):

**2. Ad hoc projects in Tool Store**

The Projects module works well for planned jobs where equipment is reserved in advance. Much of the customer’s activity is spontaneous, though: urgent jobs, equipment needs that come up on short notice, and workers moving between tasks during the day.

We would like to be able to:

- Select or create a project directly at check-out in Tool Store, without the project or equipment having been planned or reserved first.
- Have the check-out and check-in history stored on that project, so it can be used in reports and as an invoicing basis (see point 1).
- Keep the check-out flow as fast as today, ideally with the project as one optional field alongside the existing _Comment_ and _Place to be used_ fields.
- Add more information to the projects in Onix Work, it should not be used in Tool Store, only the opportunity to create a Project Name where we can add equipment, and then later on use the history and data.

Today the customer works around this by linking projects or vessels to Tool Store users and using comments. This is manual and cannot be reported on.

A workaround such as leaving equipment checked out in the system after physical return is not an option. It gives wrong stock status and causes unnecessary searching for equipment.

---

<div class="post-metadata">

**Author:** ![nabil.omar](https://dub1.discourse-cdn.com/flex013/user_avatar/community.onix.com/nabil.omar/32/1864_2.png) [@nabil.omar](https://community.onix.com/u/nabil.omar)\
**Post date:** [November 2, 2026, 7:43am UTC](https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701/3 "2026-11-02T07:43:24Z")

</div>

Hi Julie,

Thank you for sharing your product idea!

Tool Store is designed to manage equipment inventory and track check-in and check-out activities, rather than serve as a planning tool.

For project planning and equipment reservations, we’ve developed the Projects module, which integrates with Tool Store to support sending and receiving equipment allocated to projects.

That said, when checking out equipment in Tool Store, you can specify the **“Place to be used”**. This could serve the same purpose as your suggestion of adding an additional column for the project name, allowing you to track where the equipment is intended to be used without introducing additional functionality.

---

<div class="post-metadata">

**Author:** ![julie.nymo](https://avatars.discourse-cdn.com/v4/letter/j/d78d45/32.png) [@julie.nymo](https://community.onix.com/u/julie.nymo)\
**Post date:** [November 2, 2026, 12:05pm UTC](https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701/4 "2026-11-02T12:05:22Z")

</div>

Hi Nabil,

Thank you for the quick reply and for pointing to _Place to be used_!

The challenge with _Place to be used_ is that it is a free text field. The value is saved in the equipment history, but free text is hard to search and report on in practice. The same project or yard easily ends up registered as “Yard A”, “Yrad A”, “YardA” by different people, so the data cannot be used reliably for reports.

I also want to clarify the purpose of the idea, as I may not have been clear enough. The goal is not to turn Tool Store into a planning tool. Planned work and project follow-up should still be handled in the Projects module in Onix Work. The need is to also track unplanned, sudden equipment use in Tool Store, so it can be searched, reported on and linked to a project if relevant. Today the planned part is covered, but the unplanned part, which makes up much of the customer’s daily activity, is not.

---

<div class="post-metadata">

**Author:** ![nabil.omar](https://dub1.discourse-cdn.com/flex013/user_avatar/community.onix.com/nabil.omar/32/1864_2.png) [@nabil.omar](https://community.onix.com/u/nabil.omar)\
**Post date:** [November 9, 2026, 8:21am UTC](https://community.onix.com/t/ad-hoc-projects-in-tool-store/2701/5 "2026-11-09T08:21:56Z")

</div>

Hi @julie.nymo ,

Thakn you for the feedback.

The intended use of Tool Store is to peronally check out equipment, so that our customers can always keep track of who used what, and what is available for use. That’s why the first step of checking out an equipment is identification.  
The “Place to be used” field is for the users to indicate what geographical location this equipment will be used in, something that can vary a lot, which is why it’s configured as a free text field.

I understand that there is a need to have ad-hoc checkouts to projects, but the consequence of not planning this is that you will never know when this equipment will be available again.  
I’ll open this idea up for discussion to see if this is a need other customers also have.

Again, thank you for the feedback!
