Hello, we have aprox 40 Flouid containers going offshore, is it possible to get imo as an intervall option? the flouid tanks have NDT, 12 months and IMO so it would been nice to have IMO as an intervall so the customer can see that the NDT and the IMO expire the same date.
Hei @Kenneth_Rokstad
Vi jobber med å utvide listen med jobbintervall beskrivelser. Vi er ikke i mål med en endelig liste, men dette gir deg et bilde på hvordan listen kan se ut, har du noen tanker? (her har vi blant annet tatt med IMO):
PI – Periodic inspection
TLA – Temporary lifting appliance inspection
DROPS – Dropped Object Prevention Scheme inspection
EX – Explosion inspection (explosion resistance)
LDT – Load testing
NDT – Non-destructive testing
IMO – Compliance test (safety and fire standards)
SOLAS – Equipment inspection (safety at sea)
MARPOL – Compliance inspection (pollution prevention)
DNV – Certification inspection
ATEX – Zone inspection (Explosive Atmospheres Directive)
PED – Test according to the Pressure Equipment Directive
FFA – Function test of firefighting equipment
LSA – Inspection of life-saving appliances
CO2 – Test of fixed CO₂ fire extinguishing system
GMDSS – Function test of GMDSS radio equipment
EEBD – Check of emergency escape breathing device
HYD – Pressure test of hydraulic system
EL – Electrical function test
GAS – Gas detector calibration
INST – Instrument calibration
SI – Safety compliance inspection
FS – Fire safety inspection
RA – Rescue and access compliance inspection
ST – Structural integrity inspection
FI – Functional integrity test
QC – Quality control verification