After the 2026 Winter JAN release, your idea has been implemented and is now available for use. Please feel free to try it out and share your feedback with us. ![]()
The following job interval descriptions are currently supported:
- Connection check
- DROPS – Dropped Object Prevention Scheme (DROPS) inspection
- DWP – Special inspection
- EX – Explosion Inspection (Explosion resistance)
- Extended periodic inspection
- IMO – International Maritime Organization inspection
- LDT – Load Testing
- NDT – Non Destructive Testing
- Oil change
- Regular periodic inspection
- Service
- Temporary lifting appliance inspection
- Threshold value test
- Wire replacement
- Z015 – Temporary equipment check
If you would like to explore additional updates included in the 2026 Winter JAN release, you can review them here:
https://community.onix.com/t/2026-winter-release-notes/2266
Once again, thank you for sharing your idea with us. ![]()